Opening (Morning Shift)
Shift Supervisor’s Checklist
  - Notify area management that the Ski Patrol is on the air and identify the Shift Captain. Contact Risk Manager or check white board and map for any new information.
 
  - Make Coffee
 
  - Check White board and Map for notes from the previous evening shift.
 
  - Check all on and off ramps, via snowmobile, prior to Patrollers using chairlifts.
 
  - Assign Shift Duties on Whiteboard prior to Patrollers leaving
 
  - Assign radios to all Patrollers.
 
  - Contact Snow Making to check where snow was made the prior night and if there is snow making in progress
 
  - Contact Grooming to make sure they are off the hill or have their location and ETA on finishing.
 
  - Assign Patrollers to inspect all lifts and trails prior to opening them to public:
    
      - Deliver any toboggans that may have been left overnight at Patrol Room area.
 
      - Ride each lift, including J-Bar. Check loading and unloading ramps for snow coverage. Snow should be 18” to 22” from the bottom of the chair.
 
      - Remove and store any Trail Closed Signs on trails to be opened.
 
      - Check all open trails for hazards.
        
          - Assigned patrollers should take a drill if necessary
 
          - Mark hazards and trail edges (if necessary) with bamboo and note on 1 Risk Hill Opening App. All bamboo should have appropriately notes disc on it
 
          - Snowmaking equipment/hoses must be off trail and behind hydrant line. Do not move or adjust any snowmaking equipment. Notify Trail Maintenance Supervisor or Risk Manager if there is a problem with snowmaking equipment.
 
          - Groomers must be off the hill prior to opening
 
          - Pull Ribbons across entrances for any closed trails
 
          - Place “EXPERT ONLY” signs
 
          - Place “NO RENTAL EQUIPMENT” signs
 
          - Place “TRAILS MERGE” Signs
 
          - Place “SLOW SKIING” Signs
 
        
       
      - Check fences and padding, adjust when possible. Report problems to Risk Manager and Maintenance if necessary.
 
      - Check all toboggan shelters:
        
          - For Toboggans
 
          - For ready access (remove drifted snow)
 
          - Backboard(s)
 
          - Equipment pack
    - Put up any control fencing and Signage on weekends and holidays
 
          - Family Ski Area on Whitney’s Way
 
          - Chicane at bottom of Blue
 
        
       
    
   
  - Snowmobile
    
      - Remove and store cover
 
      - Check levels before starting
        
      
 
      - Bring Drill
 
      - Drive carefully
 
    
   
  - Unlock Station 2
    
      - Check Supplies. Contact dispatch for any needed supplies of if there are problems
        
          - Check O2 level in Crash Cart
 
          - Check Splints and Backboards
 
          - Set heat to reasonable level
 
          - Clean Sheet and pillow case on wood exam table
 
          - Fresh paper on metal exam table
 
          - Leave Key on hook by slope side door
 
          - Unlock and open rear access gate
 
        
       
    
   
  - Unlock Top Duty (front and back doors)
    
      - Set heat to a reasonable level
 
      - Check for Trauma Bags
        
          - Security locks
            
              - O2 bags and O2 PSI (2 each)
 
              - Set out toboggans from Garage
 
              - Check for 2 Cambi boards
 
              - Check Quick Splints e/w padded splints (3) ≥ 2
 
              - AED
 
              - Put out flags
 
              - Make Coffee
 
              - Check Computer
 
              - Hand out D
                
                  - Check Charge level
 
                  - Remove any batteries from charger
 
                
               
              - Clean up from night crew
 
            
           
        
       
    
   
  - Inspect First Aid Room
    
      - O2 level on large bottle
 
      - Check for
        
          - Supplies
 
          - Clean sheets under mobile stretcher and exam gurneys
 
          - Trauma bag (security locks)
 
          - O2 bag
 
          - Quick Splints e/w padded splints (3) ≥ 2
 
          - Replace an torn or damaged disposable sheets and pillow cases
 
          - AED
 
          - Pulse-Ox meters (4)
 
          - Bio Containers
 
        
       
      - Return any rental equipment
 
    
   
  - Notify Lift Supervisor, Ski School and MOD of readiness to open for:
    
      - first tracks
 
      - ski school
 
      - General Opening
 
    
   
  - Plan reckless skier control activities and assign personnel
 
  - Prepare daily slope report in 1 Risk